This window provides complete details on how the meter units
billing amount was calculated.
The prompts include:
There are two methods of calculating the units eligible for billing:
Refer to Company Billing Parameters for setup and an explanation of the differences in the billing approaches.
The Meter Out End is the final meter unit count of the
old meter that is being replaced on the product.
The Meter In Start is the starting meter unit count of the
mew meter that is being installed.
If a meter exchange occurred the Meter Used is then based on
the units used on the original meter plus the units used on the
replacement meter as follows:
The Meter Exchange field indicates the meter count if a meter replacement was done.
Meter usage can be billed by the unit or by the shift as determined in the Product Class. For further information refer to Rental Product Class.
Converted from CHM to HTML with chm2web Pro 2.85 (unicode) |