Dollar/Time Utilization Overview


Reports Menu -> Utilization -> Dollar/Time Utilization
Time Utilization Reporting
Dollar Utilization By Group
Dollar Utilization By Tool

Failed Data Capture Email List

Automated Job Scheduling

To take advantage of the Dollar/Time Utilization reporting, the data must first be captured through the Automated Job Scheduling.

By using automated job scheduling, certain maintenance and reporting jobs, including these Rental Utilization reports based on product data sets, can be setup to run automatically at specific times as a CRONJOB. The listing of these jobs can be maintained in Automatic Job Scheduling, assigning the occurrence, time, and printer. The last date and time that the job was run is also displayed here.
This feature is only available to LINUX and NT systems.

A "Snapshot" must first record the status of each rental product. This can be setup in the schedule under the following job names:

Once the daily snapshots have been recorded, the output can then later be generated as a report from:

Converted from CHM to HTML with chm2web Pro 2.85 (unicode)