Clone Maintenance Schedule
Work Order Menu -> Maintenance Scheduling -> Maintenance Schedule -> CLONE
button -> Clone Maintenance Schedule
This program copies an existing maintenance record for a product
as setup in Maintenance Schedule with kits
and instructions, to another product or selection of products.
The prompts are:
-
- FROM PRODUCT#
- Enter the source product number of the equipment that already
has a maintenance record setup, or select one from the Inventory Search window.
MAINTENANCE TYPE, "ALL" OR "SEL"
- Enter the type of the existing maintenance record, or select
one from the drop-down list, or type "ALL" to include all types, or
type "SEL" to open the Select Maintenance
Types window to build a list of maintenance types to be
copied.
MAINTENANCE CODE, "ALL" OR "SEL"
- Enter the maintenance code of the existing product maintenance
record, or select one from the Maintenance
Code Search window, or type "ALL" to include all maintenance
codes, or type "SEL" to open the Select
Maintenance Codes window to build a list of codes to
include.
TO PRODUCT # OR "SEL"
- Enter the number of the equipment to which the maintenance
record should be copied, or select one from the Inventory Search window, or type "SEL" to open the
Select Products window to build a list of
products to be updated.
If the maintenance type is for a meter reading, this product
must be setup as a meter product in Rental
Inventory.
Finished?
- Click ACCEPT to create the new maintenance record, or CANCEL to
abort.
Topic Keyword: WOMS20